Click here to Login
Subscribe for Newsletter GoToChef for Brands
  • Long & Short High Fibre Pasta Powered With Jowar, Bajra & Ragi Spaghetti   Box  250 grams
  • Long & Short High Fibre Pasta Powered With Jowar, Bajra & Ragi Spaghetti   Box  250 grams
  • Long & Short High Fibre Pasta Powered With Jowar, Bajra & Ragi Spaghetti   Box  250 grams
  • Long & Short High Fibre Pasta Powered With Jowar, Bajra & Ragi Spaghetti   Box  250 grams

Long & Short High Fibre Pasta Powered With
Jowar, Bajra & Ragi Spaghetti Box 250 grams

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Reviews : 0 ( write a review )
Nutrition & Ingredients

Food Type

  • Vegetarian

Nutrition Grid

  • Serving Size 100 gm
  • Total Calories / Energy 375 Kcal
  • Protein 13 gm
  • Total Fat 4 gm
  • Total Carbohydrates 73 gm
  • Total Sugars 0 gm
  • Dietary Fiber 13 gm
  • Iron 7 mg
  • Show All Show less

Ingredients

Show All Show less

Nutrition Notes

Durum Wheat Semolina (70%), Jowar (10%), Bajra (10%) & Ragi (10%)

Details

More Information

  • FSSAI Number
    10719025000455 10019022010723 10013013000567

Ratings (0)

overall rating
Taste and Texture
value for money
packaging
Reviews

Brand comments

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.